This project is located in Meigs County, near Langsville, OH. This project is a follow-up to the first project, and was likely gained through both competitive pricing and a good working relationship with the owner, Consol Energy. This project consists of constructing concrete troughs and HDPE Pipe required to utilize the ponds that were either created or modified in Phase 1. The project also includes the construction of a control building and foundation pad for the installation of two large lime bins. Our concrete subcontractor will be Ahern & Associates and they will form and pour the troughs that will carry the treated water from pond to pond. This is a unit price contract with a starting date of September 3, 2008.
« Back